Construct Only.
Construction comprised of minor alterations and additions to Level 1 and Level 2 of the administration building (Block A) which is located at the main entrance to the campus. A new platform lift was built to connect the road/pathway to Level 2 of Block A.
All works were conducted in a live environment.